General Info
Area: -
Client: Sociedade de Construções ERG, Lda
Architecture: -
Details
This open air sports complex built in Rio Maior has competition pools for speed and diving. Both are built with Olympic competition standards. The speed pool is standard with 50m length with 10 lanes and the diving pool has boards at 5m and 10m height.
All the structures are of reinforced concrete, designed to be water tight as required. Alongside the pools are underground technical galleries that house, and give access to, the pipe work and auxiliary equipment.
Please wait.
Your email has been sent successfully. We will reply as soon as possible.
Email delivery failed, please try again.